Technological firing equipment from 1990
- Dryer for washing powder
Tiszai Vegyi Művek Mosópor Üzem, 1987
- Dryer for agricultural forage
Fagro Kft. Szárító, Dabas 1987
- Air preheater for glass melting tanks through PB gas firing
Nigeria (Chief Contractor TUNGSRAM Co.), 1987
- Natural gas fired air preheater with 300 kW heating capacity
TUNGSRAM Vác, 1987
- Rotary furnace for natural gas firing
NEFÉM Székesfehérvár, 1987
- Heavy oil firing 160 kg/h
Indonesia (Chief Contractor TUNGSRAM Co.), 1988
- Air preheater with heavy oil firing for glass melting tanks
India (Chief Contractor TUNGSRAM Co.), 1988
- Air preheater with natural gas firing for glass melting tank
Egypt (Chief Contractor TUNGSRAM Co.), 1988
- PB gas fired thermogenerator with 600 kW heating capacity
Tojásszárító Bábolna, 1988
- CO afterburner for cupola furnace
BVG Budapest, 1988
- Tunnel type furnace for natural gas firing
ATV Kunszentmárton, 1988
- Tunnel type furnace for natural gas firing
BTV Törökbálint, 1988
- Air preheater with natural gas firing
Poland (Chief Contractor TUNGSRAM Co.), 1989
- Air preheater with natural gas firing
Iran (Chief Contractor TUNGSRAM Co.), 1988
- Thermogenerator for natural gas
ATV Hajduszoboszló, 1989
- Tunnel type furnace for natural gas firing
ATV Hajduszoboszló, 1989
- Tunnel type furnace for natural gas firing
BTV Pilisborosjenő, 1989
- Thermogenerator for natural gas
SZTV Balatonszentgyörgy, 1989
- Tunnel type furnace for natural gas firing
SZTV Balatonszentgyörgy, 1989
- Preheating facility for shaft furnace
BAC Bélapátfalva, 1989
- Hot air generator with natural gas firing
SVT Salgótarján, 1990
- Dolomite drying facility
DCM, Vác, 1990
- Natural gas fired hot air generator, 120 kW heating capacity, 200 °C air temperature
SVT Salgótarján, 1990
- Thermogenerator for natural gas
BTTCSV Mohács, 1990
- Tunnel type furnace for natural gas firing
BTTCS Mohács, 1990
- Circular furnace for natural gas firing
ÉTCSV Eger, 1990
- Tunnel type furnace for natural gas firing
ÉTCSV Eger, 1990
- Tunnel type furnace for natural gas firing
SZTV Tesknád, 1990
- Tunnel type furnace for PB gas firing
ATV Debrecen, 1990
- Rotary furnace for oil firing
Eternit V. Selyp, 1991
- Thermogenerator for PB gas
KDTV Bakonyszentlászló, 1991
- Tunnel type furnace for natural gas firing
KDTV Bakonyszentlászló, 1991
- Supply system for rotary furnace
Cement Work of Lábatlan, 1991
- Tunnel type furnace for natural gas firing
ÉTCSV Fehérgyarmat, 1991
- Upgrading of thermogenerator
HVVTR Inc. Őrbottyán, 1991
- Natural gas firing of tunnel type furnace
BTTCSV Bátaszék, 1991
- Firing facility for tube furnace 8 pcs. K 2000
FFOMOL Inc. Zalaegerszeg, 1992
- Natural gas fired tunnel type furnace
Jamina Inc. Békéscsaba, 1992
- Translocation of firing appliance of tunnel type furnace
Jamina Inc. Békéscsaba, 1993
- Change-over of thermogenerator for natural gas firing
ÉDT Inc., 1994
- Natural gas fired tunnel type furnace
ATV Abony, 1994
- Shift furnace for natural gas firing
ALOXID Almásfűzitő, 1994
- Tunnel type furnace for natural gas and low temp. gasification /Schwel gas firing
SZEMA Szentes, 1995
- Tunnel type furnace
Budai Tégla, 1995
- Waste incinerary.
Hölter Alkaloida, 1995
- Fluegas burning facility
TVK Co. Ltd. 1995
- Upgrading of firing appliances of tube furnaces 7 pcs K 2000 FFO
MOL Inc. Zalaegerszeg, 1995
- Firing facility of PTVM boiler
DESZ Co. Ltd. 1996
- Waste burning firing equipment
TVK Co. Ltd. 1996
- Firing appliance for drying of sugar-beet
Szolnoki Cukorgyár, 1996
- Heat supply unit /2pcs./ for 3 drying lines of incand. lamps.
TUNGSRAM, Vác 1996 and 1997
- Upgrading of firing facility of tube furnaces 32 pcs. KF 2000 G, KF 2000 F
MOL Inc. Tiszaújváros, 1997
- Development of firing system of boiler
Neusiedler Papirgyár Co.
- Development of firing system for rotary drum furnace
TVK Égetőmű Co. Ltd. 1997
- Heat supply system for lamp drying line
General Electric CO. Emfield, Breat Britain, 1998
- Burning facility for waste gas
ICN Alkaloida Inc. 1998
- Ladle heating facility
Dunaferr Acélmű Co. Ltd., 1998
- Swelling facility for pearlite
Pull-Car Co.Ltd. 1998
- Upgrading of calcination furnace
Ajkai Timföld Co. Ltd. 1998
- Tube furnaces for KBI Work 14 pcs. REK3
MOL Inc. Százhalombatta, 1998
- Waste burning facility
Borsodchem Inc. 1998
- Ingot mould preheating facility
MAL-MWK Co. Ltd. 1998
- Firing equipment for tube furnaces 64 pcs.
MOL Inc. Algyő, 1998
- Heat supply system for lamp drying line
General Electric Co. Great Britain, 1999
- Firing system for rotary furnace
Ajkai Timföld Co. Ltd., 1999
- Development of inert gas burner
MOL Inc. Gellénháza, 1999
- Heat supply unit for incand. lamp drying line
GE Lighting TUNGSRAM Inc. Vác, 1999
- Firing system for preheating and burning furnaces of lighting tubes
GE Lighting TUNGSRAM Inc. Vác 2000
- Firing and energy supply unit for Canadian lighting tube manufacturing line
GE Lighting TUNGSRAM Inc. Budapest 2000
- Firing system for soldering machine
GE Lighting TUNGSRAM Inc. Budapest, 2000
- Thermogenerator for lighting tube coating line
GE Lighting TUNGSRAM Inc. Vác, 2000
- Additional firing with used oil
Holcim Hungária Inc. Lábatlan, 2001
- Alternative method for firing of coke-oven unit
Dunaferr DBK Kokszoló Co. Ltd. 2001
- Developing of thermogenerator and mixing chamber
MAL Inc. Alumina Branch, 2002
- Waste burning furnace
Framochem Co. Ltd. 2002
- Changing of burners of tube furnaces
MOL Inc. Százhalombatta, 2002
- Ladle heating facility
Alcoa Köfém Co. Ltd., 2002
- Automatic system for TG burners
Petrolszerviz Co. Ltd. Szeged, 2002
- Manufacturing of flame arrestor
Protego Ungarn Co. Ltd. Miskolc, 2002
- Firing oil system for boilers
EMA-POWER Co. Ltd. Dunaújváros, 2002
- Planning and manufacturing of the electrical control of flue gas generator
Holcim Hungária Rt. Miskolc, 2002
- Gas burners and control for FCC 400 H1 furnaces
Petroszolg Co. Ltd. Százhalombatta, 2003
- Manufacturing of 112 pcs. pilot flame burners
Petroszolg Co. Ltd. Százhalombatta, 2003
- Modification of K1 and K2 burners for boiler
FKF Inc. Budapest, 2003
- Manufacturing of 14 pcs. insert burners
Petroszolg Co. Ltd. Százhalombatta, 2004
- 2pcs. heavy-duty burners for K4 type boiler
FKF Inc. Budapest, 2004
- Manufacturing of pilot flame burners
Petroszolg Co. Ltd. Százhalombatta, 2004
- 2 pcs burners for after-burning facility
Onyx Magyarország Co. Ltd. Dorog 2004
- Upgrading of firing facilities
Nitrogénművek Inc. Pétfürdő, 2004
- Manufacturing of 43 pcs. ignition burners
Petroszolg Co. Ltd. Százhalombatta, 2004
- Manufacturing of main burner for Bitumen Works
Petroszolg Co. Ltd. Százhalombatta, 2004
- Upgrading of firing system of ladle drying systems
DUNAFERR Ferrocontrol Co. Ltd., Dunaujváros 2004
- Modification of safety control of tube furnaces by AV-2 refinery tube furnaces
Petroszolg Co. Ltd. Százhalombatta, 2004
- Design and manufacturing of firing system of VCW Work cracking furnace
Borsodchem Rt., Kazincbarcika 2005
- Firing system of TO-6 boiler
Petroszolg Co. Ltd. Százhalombatta, 2005
- Developing of alternative firing system
Holcim Zrt. Miskolc 2006
- Renewing and firing system of PAM Work by changing and instellation of 6 pcs K 1600 M (NOx) burners
Petrolszolg Kft. Százhalombatta; 2006
- Modifying of 3x8 pcs oil burners for tube furnaces of AV-3 Work
Petrolszolg Kft. Százhalombatta; 2006
- Changing of burners by tube furnaces of REF-4 Work, installation of 4 pcs BGT 1600 (NOx), 4 pcs BGT-800 (NOx), 4 pcs BGT-400 (NOx) burners,
4 pcs K 1600 M (NOx) burners in order to reduce the NOx content
Petrolszolg Kft. Százhalombatta; 2006
- 30 pcs pilot burners of GEI-20 type for the tube furnace of Hydrogen Work
MOL Nyrt. Százhalombatta; 2006
- Combined fuel burner and auxiliary device, K-8000K6 (NOx) type burner for 6 various fuels with reduced NOx emission
Onyx Magyarország Kft. Dorog, 2006
- Development of firing system of basalt smelting furnace
TOPLAN Kft. 2007
- Modifying of the firing system of boiler No. V. with 75 t/h steam capacity in using 4 pcs of 10 MW and 4 pcs of 16 MW burners
with reduced NOx emission
ISD POWER Kft. Dunaújváros, 2007
- Low NOx BGT-1000 (NOx) type gas burner for PBKM 101 type furnace
MOL Nyrt. Százhalombatta, 2007
- Modifying of BTH-16-F type heavy duty burner
FKF Zrt. Hulladékhasznosítómű, Budapest; 2008
- Modifying of firing system by No.VI. boiler with steam capacity of 75 t/h
ISD POWER Kft., Dunaújváros; 2008
- Manufacturing of 7 pcs GPI-20-840 and 12 pcs GEI-20-SZ-340 pilot burners for MOL Inc.
Petrolszolg Kft. Százhalombatta; 2008
- Manufacturing of 45 pcs oil lances for MOL Inc.
PCI Kft. Százhalombatta; 2008
- Renewing of burning system
GE Hungary Kft. 2009
- Waste heat utilisation by installing 6 pcs BTH-16-F type burners of special insert
FKF Zrt. Hulladékhasznosítómű, Budapest; 2009
- Manufacturing of GPI-20 ignition burners and GEI-20-SZ pilot burners for MOL Inc.
Petrolszolg Kft. Százhalombatta; 2009
- Manufacturing of 36 pcs pilot burners of GEI-20-SZ-340
John Zink 2009
- Extension of firing system of No. IX. boiler fuelling with chamber gas
ISD POWER Kft., Dunaújváros; 2009-2010
- Modifying of combustion system of by the bell-type furnace unit I-IV.
ISD Dunaferr Zrt., Dunaújváros; 2010
- Design and permissioning of combustion system of bell-type furnace unit No.Vth.
ISD Dunaferr Zrt., Dunaújváros; 2010
- New design and modification of firing remote control system because of change of zink coating tank
Mizsei Kft.; 2010
- Manufacturing of 1 pcs. ignition burner type GEI-2SZ-700 for
Petrolszolg Kft.; 2010
- Manufacturing of natural gas fired supplementary burners No.1 and 2 boilers of Power Work BC HRSG
SINERGY Kft.; 2010
- Change of sucking ventilator of boiler air supply
ISD Dunaferr Zrt.; 2010
- Repairing of 3 pcs. stock burners
MOL Nyrt., 2010
- Manufacturing of 8 pcs. burners of GPI-20-840 and 3 pcs. GEI-20SZ-700
Petrolszolg Kft.; 2010
- Hot gas generator
Kompozitor Műanyagipari Fejlesztő Kft.; 2011
- Modification of 6 pcs.K-1600 type burners for PAMI 109 heater
MOL Nyrt.; 2011
- UK-3000 K3 combined fired burner for
SARPI Dorog Kft.; 2011
- Allowances for gas heat treating furnace P6 Northern Combustion
Firth Rixson Hungária Kft.; 2011
- HK-3000 A2 type alternative fired burner BR-6020
MOL Nyrt. Tiszai Finomító Energiagazdálkodás Hulladékégető Üzem; 2012
- Statical testing of elevators of gas holders
ISD POWER Kft., 2012
- Making of over-pressure safety system
ISD POWER Kft., 2012
- Manufacturing of rope drum for heat treating elevator
Le Belier Magyarország Formaöntöde Zrt.; 2013
- Development of boiler family for briquet firing
MAG Zrt. 2013
- V. unit No. 1. bell-type furnace, installation of natural gas fired injector burner
ISD Dunaferr Zrt., 2013
- Allowances for gas furnaces
Firth Rixson Hungária Kft., 2013
- Facility for investigation of the rate of refractory quality
GD Gép és Daru Kft.; 2013
- Operational allowances for walking beam furnace /280 t/ h capacity
ISD Dunaferr Zrt., 2013
- Manufacturing of ignition chamber
Petroszolg Co.Ltd.; 2014
- Realisation of natural gas firing by the bell-type furnaces of slabbing mill of ISD DUNAFERR Inc.
ISD DUNAFERR Inc.; 2014
- Manufacturing of drying facility for waste water sludge
Enviro-Pharm Co. Ltd. 2015
- Manufacturing of Thermogenerators
Duna-Dráva Cement Kft. 2016
- Manufacturing of zincing tank heat recovery and additional firing
Galvaflex Kft., 2016
|